The Moore Creek Shed project combined footing preparation, a concrete slab and shed erection within a defined construction package. Physically completed in 2025, the building features metal cladding, roller doors, windows and an open bay. The project brought together site preparation, structural assembly and finishing work, supported by documented scope boundaries and approval information.
The approved proposal established three main components: preparation for the footings, concrete slab construction across the shed area and erection of the shed. This defined the core building work while identifying related services and site items requiring separate arrangements.
The project records follow the work from its documented scope and site assumptions through approval, visible construction stages and final site tasks. A construction certificate was issued in July 2025, with finishing activities recorded in October and a subsequent November email confirming that the project was completed.
Preparation for the footings and construction of the concrete slab formed the groundwork component of the accepted proposal. The slab extended across the shed area, providing the base shown beneath the steel frame in the construction photographs.
The proposal described the site as cleared and level and used an assumed soil classification. Rock excavation, retaining walls, underground service locating and concrete piers were separately excluded. These boundaries distinguished the included preparation and slab work from additional ground-related tasks.
Shed erection followed the groundwork and slab stage. Construction photographs show the steel frame standing on the concrete slab with temporary bracing, followed by later views of the clad building and its openings.
The finished shed is shown with metal cladding, roller doors, windows and an open bay. These features describe the building's enclosure and access arrangement without assuming dimensions or internal uses beyond those documented for the project.
Roller doors formed part of the building, while electric motors for those doors were outside the proposal. Electrical connections were also excluded, making powered door operation a separate consideration from the doors themselves.
Connections to stormwater and sullage were excluded alongside electrical services. Recording these items separately clarified where the core shed package ended and where further service coordination would be required.
The construction certificate was issued in July 2025. Its reference schedule identifies architectural drawings, shed engineering, a design certificate and a soil report, bringing design and site information into the approval package.
The proposal identified a possible August construction window, subject to the construction certificate and other stated conditions. This was an indicative window rather than a confirmed commencement date. The dated certificate and later site records provide separate milestones in the documented project sequence.
The photographic record shows earthworks and plant on site, the steel frame on its slab, and the later metal-clad building. This sequence documents progress through site work, framing and enclosure.
The October site diary records a final clean, adjustment of a roller door, cutting in the personnel access door and removal of rubbish. These finishing activities provide specific detail about bringing the physical build to completion, beyond the appearance of the finished shed.
Moore Creek demonstrates how shed construction brings together several connected responsibilities: ground preparation, concrete work, erection, openings, services and approval documentation. The proposal identified the included building work and exclusions before the later photographs and site diary recorded construction progress.
For owners considering a similar project, the documented scope provides useful discussion points about site assumptions, service connections and the work included at each stage. General background is available in the NSW Government guidance on building approvals.
The core construction package covered footing preparation, a concrete slab across the shed area and shed erection.
The project photographs show a metal-clad shed with roller doors, windows and an open bay. The construction record also includes personnel access door work during the finishing stage.
Stormwater, sullage and electrical connections were excluded from the proposal, along with electric motors for the roller doors. These items required separate arrangements outside the stated building package.
The proposal described a cleared, level site and used an assumed soil classification. Rock excavation, retaining walls, underground service locating and concrete piers were excluded.
Physical completion is supported in 2025. The October site diary records finishing tasks, and a subsequent November email describes the project as completed. The construction certificate was issued in July 2025.
Talk with Datum Projects about footing preparation, slab and erection scope, site conditions and the services that may need separate coordination for a shed in Moore Creek or the Tamworth district.